7.E.2.
7.E.3.
Recommendation for the approval of a contract to Dynamic Industrial Services, Inc., to
provide fuel tank rehab painting at the Power Plant, for Facilities Management, for the
period March 29, 2023, through November 30, 2023, for a total contract amount not to
exceed $46,000; per lowest responsible bid 23-039-FM.
Recommendation for the approval of a contract to Petroleum Traders Corporation, to
furnish and deliver off-road diesel fuel, as needed, for the Power Plant and Standby
Power Facility, for the period April 1, 2023 through March 31, 2024, for Facilities
Management, for a contract total not to exceed $101,000; per lowest responsible bid
#23-011-DOT.
7.E.4.
7.E.5.
Recommendation for the approval of a contract to Thompson Electronics Company, for
preventive maintenance, testing and repair of the Edwards Systems Technology Fire
Panels for the County campus, for Facilities Management, for the two-year period April
14, 2023 through April 13, 2025, for a total contract amount not to exceed $121,500, per
renewal option under bid award #21-012-FM, first and final option to renew.
Recommendation for the approval of a contract to Metropolitan Industries, Inc., to
provide pump repairs, replacement pump parts, and replacement Metropolitan Pumps, as
needed, for the County campus, for Facilities Management, for the two-year period April
14, 2023 through April 13, 2025, for a total contract amount not to exceed $60,000. Per
55 ILCS 5/5-1022 “Competitive Bids” (c) not suitable for competitive bids – sole
provider of items compatible with existing equipment.
7.E.6.
Recommendation for the approval of a contract to Hampton, Lenzini and Renwick, Inc.,
to provide Professional Architectural and Engineering Design Services, for sidewalk
repairs on County Campus, for Facilities Management, for the period March 28, 2023,
through November 30, 2024, for a total contract amount not to exceed $121,560.
Professional Services (Architects, Engineers and Land Surveyors) vetted through a
qualification-based selection process in compliance with the Illinois Local Government
Professional Services Selection Act, 50 ILCS 510/ .01 et seq.
7.E.7.
Recommendation for the approval of a contract to Facility Gateway Corporation, to
provide uninterrupted power supply (UPS) preventive maintenance and on-call
emergency repair service as needed, for Facilities Management and the Emergency
Telephone System Board (ETSB), for the two-year period April 1, 2023 through March
31, 2025, for a total contract amount not to exceed $74,773.30, per lowest responsible bid
#23-031-FM. ($33,844.30 for Facilities Management and $40,929.00 for ETSB)