File #: DT-R-0033-24    Version: 1
Type: Transportation Resolution Status: Adopted
File created: 9/4/2024 In control: Transportation Committee
On agenda: 9/17/2024 Final action: 9/24/2024
Title: AUTHORIZING APPLICATION OF AN ILLINOIS TRANSPORTATION ENHANCEMENT PROGRAM (ITEP) GRANT FOR DESIGN ENGINEERING, CONSTRUCTION AND CONSTRUCTION ENGINEERING OF STEARNS ROAD MULTIPLE USE PATH SECTION 23-00285-03-BT
Attachments: 1. CL 2024-14-2024 ITEP

title

AUTHORIZING APPLICATION OF AN ILLINOIS TRANSPORTATION

ENHANCEMENT PROGRAM (ITEP) GRANT FOR DESIGN ENGINEERING, CONSTRUCTION AND CONSTRUCTION ENGINEERING OF

STEARNS ROAD MULTIPLE USE PATH

                                                                                                         SECTION 23-00285-03-BT

resolution

WHEREAS, the County Board of DuPage County, by prior resolution at its May 14, 2024 meeting, approved a contract to undertake a concept development engineering study of a proposed multi-use path along Stearns Road from the DuPage/Kane County Line to Munger Road; and

WHEREAS, the concept plan will yield a preferred route to carry forward into Phase 1 and design engineering; and

WHEREAS, the Illinois Transportation Enhancement Program (hereinafter “ITEP”) grant application cycle 15 is underway through the Illinois Department of Transportation (hereinafter “STATE”); and

WHEREAS, funds for the ITEP Cycle 15 are to be awarded for up to $3,000,000.00 maximum per project, on a competitive basis for well planned projects that provide and support alternate modes of transportation; and

WHEREAS, the Stearns Road Multi-Use Path project was identified as a high priority project in the DuPage County Bikeway Plan; and

WHEREAS, the County desires to submit an application for ITEP funding, in the amount of $3,000,000 for Phase 2 Design Engineering, construction and/or construction engineering; and

WHEREAS, the County will fund the required 20 percent local match (estimated $750,000) and any additional cost over $3,750,000, if said grant is awarded.

NOW, THEREFORE, BE IT RESOLVED by the DuPage County Board that the Director of Transportation and County Engineer are hereby authorized and directed to apply for grant funds from the STATE, under its ITEP Cycle 15, for the Stearns Road Multi-use Path from the DuPage County/Kane County Line to Sayer Road; and

 

 

 

 

 

 

 

 

 

 

 

BE IT FURTHER RESOLVED that if the said grant is approved by the STATE, a funding agreement will be brought forward to the DuPage County Board for approval of the necessary funds.

end

 

Enacted and approved this 24th day of September, 2024 at Wheaton, Illinois.

 

 

 

________________________________

DEBORAH A. CONROY, CHAIR

DU PAGE COUNTY BOARD

 

 

Attest: ___________________________________

JEAN KACZMAREK, COUNTY CLERK