title
AGREEMENT BETWEEN THE COUNTY OF DUPAGE, ILLINOIS
AND CONTIGO ENGINEERING, PLLC
FOR ON CALL PROFESSIONAL ENGINEERING SERVICES
(TOTAL CONTRACT: $70,000)
resolution
WHEREAS, the COUNTY by virtue of its power set forth in “Counties Code” (55 ILCS 5/5-1001 et seq.) and its authority to manage and mitigate the effects of urbanization on stormwater drainage in DuPage County pursuant to Chapter 55, paragraph 5/5-1062.3 is authorized to enter into this AGREEMENT; and
WHEREAS, the COUNTY requires on-call professional engineering services to review stormwater permit applications and their accompanying technical submittals for compliance with the DuPage County Countywide Stormwater and Floodplain Ordinance (DCSFO), to assist the COUNTY with complex technical submittals including advanced hydrology and hydraulics, as requested, to perform field visits to observe existing conditions and to verify as-built conditions when requested by the COUNTY, and to attend, as requested, field or office meetings and document meeting discussions in formats designated by the COUNTY (hereinafter referred to as “PROJECT”); and
WHEREAS, the CONSULTANT has experience and expertise in this area and is in the business of providing such professional engineering services and is willing to perform the required services for an amount not to exceed seventy thousand dollars and no cents ($70,000.00); and
WHEREAS, the CONSULTANT acknowledges that it is qualified to perform the services covered by this AGREEMENT and is in good standing and has not been barred from performing professional services; and
WHEREAS, the COUNTY has adopted a Stormwater Ordinance and the Stormwater Management Plan. The CONSULTANT acknowledges the necessary oversight to ensure compliance with the Stormwater Ordinance and Stormwater Management Plan in the event the PROJECT necessitates this scope of work.
WHEREAS, the CONSULTANT acknowledges that it is qualified to meet the requirements of Section 15-127.A.3.a.1, 15-127.A.3.a.2 and Section 15-127.A.3.a.3 of the DuPage County Countywide Stormwater and Flood Plain Ordinance (hereafter “Stormwater Ordinance”) to perform the services covered by this AGREEMENT and is in good standing and has not been barred from performing professional services; and
NOW, THEREFORE, BE IT RESOLVED by the DuPage County Board that the attached AGREEMENT between the COUNTY and Contigo Engineering, PLLC is hereby accepted and approved, and that the Chair of the DuPage County Board is hereby authorized and directed to execute the AGREEMENT on behalf of the COUNTY.
BE IT FURTHER RESOLVED that the DuPage County Clerk be directed to transmit certified copies of this Resolution and the attached AGREEMENT, by and through the Stormwater Management Department, to Contigo Engineering, PLLC.
end
Enacted and approved this 12th day of May, 2026 at Wheaton, Illinois.
________________________________
DEBORAH A. CONROY, CHAIR
DU PAGE COUNTY BOARD
Attest: ___________________________________
JEAN KACZMAREK, COUNTY CLERK