Skip to main content
Dupage Logo
To view previous Board or Committee Meetings, please visit our YouTube channel.
Those wishing to submit virtual public comments, please use the Public Comment Form.
File #: DT-P-0086-23    Version: 1
Type: Transportation Requisition $30,000 and Over Status: Adopted
File created: 6/20/2023 In control: Transportation Committee
On agenda: 7/11/2023 Final action: 7/18/2023
Title: AGREEMENT BETWEEN THE COUNTY OF DU PAGE, ILLINOIS AND ROBINSON ENGINEERING, LTD. PROFESSIONAL (PHASE II) DESIGN ENGINEERING SERVICES DUPAGE COUNTY FUEL FACILITY RECONSTRUCTION SECTION 23-00179-35-MG (CONTRACT TOTAL NOT TO EXCEED $170,874.63)
Attachments: 1. Robinson Checklist, 2. Robinson Agreement, 3. Robinson Vendor Ethics, 4. Geocon Vendor Ethics, 5. Millies Vendor Ethics, 6. True North Vendor Ethics

title

AGREEMENT BETWEEN THE COUNTY OF DU PAGE, ILLINOIS
AND ROBINSON ENGINEERING, LTD.
PROFESSIONAL (PHASE II) DESIGN ENGINEERING SERVICES
DUPAGE COUNTY FUEL FACILITY RECONSTRUCTION
SECTION 23-00179-35-MG
(CONTRACT TOTAL NOT TO EXCEED $170,874.63)

 

resolution

WHEREAS, the County of DuPage (hereinafter “COUNTY”) by virtue of its power set forth in “Counties Code” (55 ILCS 5/5-1001 et. seq.) and “Illinois Highway Code” (605 ILCS 5/5-101 et. seq.) is authorized to enter into this agreement; and

WHEREAS, the COUNTY requires Professional (Phase II) Design Engineering Services for replacement of the Du Page County Fuel Facility, located near the Division of Transportation 140 N. County Farm Road maintenance garage (hereinafter referred to as “PROJECT”); and

WHEREAS, Robinson Engineering, Ltd. (hereinafter “CONSULTANT”) has experience and expertise in this area and is in the business of providing such professional design engineering services, and is willing to perform the required services for an amount not to exceed $170,874.63; and

WHEREAS, the COUNTY has selected the CONSULTANT in accordance with the Professional Services Selection Process found in Section 2-353(1)(a) of the DuPage County Procurement Ordinance; and

WHEREAS, the Transportation Committee has reviewed and recommends approval of the attached Agreement at the specified amount.

NOW, THEREFORE, BE IT RESOLVED by the DuPage County Board that the attached Agreement between the County of DuPage and Robinson Engineering, Ltd. be hereby accepted and approved for a contract total not to exceed $170,874.63 and that the Chair of the DuPage County Board is hereby authorized and directed to execute the Agreement on behalf of the COUNTY; and

 

 

 

 

 

 

 

 

 

 

 

BE IT FURTHER RESOLVED that an original copy of this Resolution and Agreement be transmitted to Robinson Engineering, Ltd., 127 N. Walnut Street, Suite 200, Itasca, Illinois 60143, by and through the Division of Transportation.

end

 

Enacted and approved this 18th day of July, 2023 at Wheaton, Illinois.

 

________________________________

 

DEBORAH A. CONROY, CHAIR

DU PAGE COUNTY BOARD

 

 

Attest: ___________________________________

 

JEAN KACZMAREK, COUNTY CLERK