Legislation Details

File #: SM-P-0011-26    Version: 1
Type: Stormwater Requisition $30,000.01+ Status: Sent to Finance
File created: 7/17/2026 In control: Stormwater Management Committee
On agenda: 8/4/2026 Final action:
Title: AGREEMENT BETWEEN THE COUNTY OF DUPAGE, ILLINOIS AND TROTTER & ASSOCIATES, INC FOR INSPECTION AND DESIGN ENGINEERING FOR STORMWATER FACILITIES COUNTYWIDE
Attachments: 1. Checklist - Trotter, 2. PSA - Facilities - Trotter with 2.8 only (003)_Redacted, 3. Required Vendor Ethics Disclosure Statement (Revised 01-2025) Signed_Redacted

 

title

AGREEMENT BETWEEN THE COUNTY OF DUPAGE, ILLINOIS
AND TROTTER & ASSOCIATES, INC
FOR INSPECTION AND DESIGN ENGINEERING FOR

STORMWATER FACILITIES COUNTYWIDE

resolution

 

 

WHEREAS, the Illinois General Assembly has granted the County of DuPage ("COUNTY") authority to develop watershed plans, undertake measures to control and protect against flooding, manage stormwater and to enter into agreements for the purposes of stormwater management and flood control (Illinois Compiled Statutes, Chapter 55, paragraphs 5/5-1062.3 and 5/5-15001 et seq.); and

 

WHEREAS, pursuant to said authority, the COUNTY periodically undertakes small scale stormwater management, drainage and flood control activities; and

 

WHEREAS, the COUNTY requires various professional services (surveying, modeling, inspection, conceptual and preliminary design, permitting, engineering plans and specifications, etc.), on an on-call basis, as necessary for its flood control facilities; and

 

WHEREAS, the CONSULTANT has experience and expertise providing each of the professional services required by the County and is willing to perform the required services, for an amount not to exceed ninety thousand dollars and no cents ($90,000.00).

 

WHEREAS, the CONSULTANT acknowledges that it is qualified to perform the services covered by this AGREEMENT and is in good standing and has not been barred from performing professional services; and                      

 

WHEREAS, the COUNTY has adopted a Stormwater Ordinance and the Stormwater Management Plan. The CONSULTANT acknowledges the necessary oversight to ensure compliance with the Stormwater Ordinance and Stormwater Management Plan in the event the PROJECT necessitates this scope of work; and

 

NOW, THEREFORE, BE IT RESOLVED by the DuPage County Board that the attached AGREEMENT between the COUNTY and Trotter and Associates, Inc. is hereby accepted and approved in an amount not to exceed ninety thousand dollars and zero cents ($90,000.00) and that the Chair of the DuPage County Board is hereby authorized and directed to execute the AGREEMENT on behalf of the COUNTY.

 

 

 

 

 

 

 

 

 

BE IT FURTHER RESOLVED that the DuPage County Clerk be directed to transmit certified copies of this Resolution and the attached AGREEMENT to Trotter and Associates, Inc., 40W201 Wasco Road, Suite D, St. Charles, IL 60175; Nicholas Alfonso/State's Attorney’s Office; County Auditor; Finance Director; Treasurer; Purchasing; and to the DuPage County Stormwater Management Department, by and through the Stormwater Management Department. 

 

end

Enacted and approved this 11th day of August, 2026 at Wheaton, Illinois.

 

 

 

________________________________

 

DEBORAH A. CONROY, CHAIR

DU PAGE COUNTY BOARD

 

 

 

Attest: ___________________________________

 

JEAN KACZMAREK, COUNTY CLERK