File #: SM-P-0003-26    Version: 1
Type: Stormwater Requisition $30,000 and Over Status: Sent to Finance
File created: 2/19/2026 In control: Stormwater Management Committee
On agenda: 3/3/2026 Final action:
Title: AGREEMENT BETWEEN THE COUNTY OF DUPAGE, ILLINOIS AND BLACK AND VEATCH CORPORATION FOR PROFESSIONAL ENGINEERING SERVICES FOR CONSTRUCTION OVERSIGHT FOR THE ELMHURST QUARRY HIGHWALL STABILIZATION PROJECT
Attachments: 1. PRCC - BV.pdf, 2. Agreement - B&V.pdf, 3. FG Vendor Ethics_Redacted.pdf, 4. Required Vendor Ethics Disclosure Statement (Revised 01-2025) BV Signed_Redacted.pdf

title
AGREEMENT BETWEEN THE COUNTY OF DUPAGE, ILLINOIS
AND BLACK AND VEATCH CORPORATION
FOR PROFESSIONAL ENGINEERING SERVICES
FOR CONSTRUCTION OVERSIGHT FOR
THE ELMHURST QUARRY HIGHWALL STABILIZATION PROJECT
resolution

WHEREAS, the COUNTY by virtue of its power set forth in "Counties Code" (55 ILCS 5/5-1001 et seq.) and its authority to manage and mitigate the effects of urbanization on stormwater drainage in DuPage County pursuant to Chapter 55, paragraph 5/5-1062.3 is authorized to enter into this AGREEMENT; and

WHEREAS, pursuant to said authority, the COUNTY owns and is responsible for operation and maintenance of multiple flood control facilities countywide; and

WHEREAS, the COUNTY designed and constructed the Elmhurst Quarry Flood Control Facility in accord with the above-cited grant of authority that now requires professional services to ensure the continued safe operation of that facility; and

WHEREAS, the COUNTY has determined that areas of the rock highwall in the Elmhurst Quarry Flood Control Facility are in need of stabilization to provide for the safety of employees and others that perform routine inspection, operations, and maintenance at the facility; and

WHEREAS, the COUNTY has publicly bid a construction project for work associated with stabilization of the highwalls that is anticipated to be awarded in March 2026; and

WHEREAS, the COUNTY requires professional services for the purpose of providing construction oversight of this specialty stabilization work required to keep the Elmhurst Quarry Flood Control Facility functioning properly and to provide for a safe working environment; and

WHEREAS, the CONSULTANT acknowledges the necessary oversight of these publicly bid projects to ensure compliance with the associated project bid documents and the IDOT Standard Specifications in the eve...

Click here for full text