Title: DT-P-0154C-22 AMENDMENT TO RESOLUTION DT-P-0154B-22 AGREEMENT BETWEEN THE COUNTY OF DU PAGE AND KNIGHT E/A, INC. PROFESSIONAL PHASE II DESIGN ENGINEERING SERVICES FOR IMPROVEMENTS ALONG CH 21/FABYAN PARKWAY FROM ILLINOIS ROUTE 38 TO THE COUNTY LINE SECTION 08-00210-03-FP (INCREASE $72,371.57 +30.76%)
Attachments: 1. Knight Change Order, 2. Knight Amendment, 3. Knight Vendor Ethics
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
DT-P-0154C-22
AMENDMENT TO RESOLUTION DT-P-0154B-22
AGREEMENT BETWEEN THE COUNTY OF DU PAGE AND KNIGHT E/A, INC.
PROFESSIONAL PHASE II DESIGN ENGINEERING SERVICES
FOR IMPROVEMENTS ALONG CH 21/FABYAN PARKWAY
FROM ILLINOIS ROUTE 38 TO THE COUNTY LINE
SECTION 08-00210-03-FP
(INCREASE $72,371.57 +30.76%)

resolution
WHEREAS, the DuPage County Board heretofore adopted Resolutions DT-P-0154B-22 on August 12, 2025, DT-P-0154A-22 on August 13, 2024 and DT-P-0154-22 on May 10, 2022, which approved a Local Public Agency Engineering Services Agreement between the County of DuPage and Knight E/A, Inc. (hereinafter referred to as CONSULTANT), to provide Professional Phase II Design Engineering Services for improvements along CH 21/Fabyan Parkway, from Illinois Route 38 to the County Line, Section 08-00210-03-FP; (hereinafter referred to as the AGREEMENT); and
WHEREAS, the current cost of said contract to the County of DuPage, by and through the Division of Transportation is $880,807.32; and
WHEREAS, during the development of Phase II plans, additional revisions to the proposed right of way, permanent easements and temporary easements were requested to minimize the impacts to the DuPage Airport; and
WHEREAS, additional drainage improvements of a Kane County project of Kautz Road would tie into the drainage network within the scope of the Fabyan Parkway contract, revising the drainage needs for the roadway improvements, which were not included in the original scope of the contract; and
WHEREAS, the Transportation Committee recommends a change order to increase the contract in the amount of $72,371.57, 8.22%, resulting in an amended contract total amount of $953,178.89.
NOW, THEREFORE, BE IT RESOLVED, that the DuPage County Board adopt this Amendment to Resolution DT-P-0154B-22, issued to Knight E/A, Inc., to increase the contract in the amount of $72,371.57 +8.22%, resulting in an amended contract total amount of $953,178.89, a cumulative increase of 30.76%; and extend t...