title
DT-P-0001B-24
AMENDMENT TO RESOLUTION DT-P-0001A-24
AGREEMENT BETWEEN THE COUNTY OF DU PAGE
AND CIORBA GROUP, INC.
PROFESSIONAL PHASE II DESIGN ENGINEERING SERVICES
CH 11/ARMY TRAIL ROAD BRIDGE OVER WEST BRANCH DUPAGE RIVER
SECTION 21-00240-09-BR
(CONTRACT INCREASE $77,511.85; +10.14%)
resolution
WHEREAS, the DuPage County Board heretofore adopted Resolution DT-P-0001A-24 on September 23, 2025 and Resolution DT-P-0001-24 on December 12, 2024 approving a Professional Services Agreement between the County of DuPage (hereinafter “COUNTY”) and Ciorba Group which requires Professional Phase II Design Engineering Services for improvements along CH 11/Army Trail Road bridge over West Branch DuPage River, Section 21-00240-09-BR (hereinafter “PROJECT”); and
WHEREAS, the current cost of the PROJECT to the COUNTY, by and through the Division of Transportation, is $710,208.04; and
WHEREAS, during the development of the Phase II plans, significant utility coordination and revisions to land acquisition have gone beyond the expected scope of the project. Additional unanticipated work includes modifying tree removal documents, preparing additional regulatory permits, updating environmental and structural reports and forms, as well as related changes to the plans, specifications, and estimates to be updated by Ciorba Group, Inc.; and
WHEREAS, increased funding is necessary to pay for the additional unanticipated work on the PROJECT; and
WHEREAS, the Transportation Committee recommends approval of a change order to increase the funding in the amount of $77,511.85 to cover these costs.
NOW, THEREFORE, BE IT RESOLVED that Resolution DT-P-0001A-24 is amended to extend the contract to May 31, 2028 and to reflect a cost of $787,719.89 instead of and in place of a cost of $710,208.04, an increase of 10.14%, with a cumulative increase of $127,396.85, +19.29%.
end
Enacted and approved this 24th day of November, 2026 at Wheaton, Illinois.
______________________...
Click here for full text