Dupage Logo
To view previous Board or Committee Meetings, please visit our YouTube channel.
Those wishing to submit virtual public comments, please use the Public Comment Form.
File #: DT-P-0046-24    Version: 1
Type: Transportation Requisition $30,000 and Over Status: Adopted
File created: 7/17/2024 In control: Transportation Committee
On agenda: 8/20/2024 Final action: 8/27/2024
Title: AGREEMENT BETWEEN THE COUNTY OF DU PAGE, ILLINOIS AND CHRISTOPHER B. BURKE ENGINEERING, LTD. FOR PROFESSIONAL PHASE I ENGINEERING SERVICES-PART B FOR THE EAST BRANCH DU PAGE RIVER TRAIL FROM ST. CHARLES ROAD TO THE ILLINOIS PRAIRIE PATH SECTION 19-00002-07-BT (CONTRACT TOTAL NOT TO EXCEED $539,499.00)
Attachments: 1. CBBEL Checklist, 2. CBBEL Agreement, 3. CBBEL Vendor Ethics, 4. SPACECO Vendor Ethics, 5. TSC Vendor Ethics, 6. Handout
title
AGREEMENT BETWEEN THE COUNTY OF DU PAGE, ILLINOIS
AND CHRISTOPHER B. BURKE ENGINEERING, LTD. FOR
PROFESSIONAL PHASE I ENGINEERING SERVICES-PART B
FOR THE EAST BRANCH DU PAGE RIVER TRAIL
FROM ST. CHARLES ROAD TO THE ILLINOIS PRAIRIE PATH
SECTION 19-00002-07-BT
(CONTRACT TOTAL NOT TO EXCEED $539,499.00)

resolution
WHEREAS, the County of DuPage (hereinafter referred to as COUNTY) by virtue of its power set forth in "Counties Code" (55 ILCS 5/5-1001 et. seq.) and "Illinois Highway Code" (605 ILCS 5/5-101 et. seq.) is authorized to enter into this agreement (hereinafter "Agreement"); and
WHEREAS, the COUNTY requires professional Phase I preliminary engineering services for the East Branch DuPage River Trail (EBDRT), from St. Charles Road to the Illinois Prairie Path, Section 19-00002-07-BT; and
WHEREAS, Christopher Burke Engineering, Ltd. (hereinafter "CONSULTANT") has experience and expertise in this area and is in the business of providing such professional preliminary Phase I engineering services, and is willing to perform the required services for an amount not to exceed $539,499.00; and
WHEREAS, the COUNTY has selected the CONSULTANT in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/0.01 et seq. and Section 2-353(1)(a) of the DuPage County Procurement Code; and
WHEREAS, the Transportation Committee has reviewed and recommends approval of the attached Agreement at the specified amount, for a contract period of August 27, 2024 through October 31, 2026.
NOW, THEREFORE, BE IT RESOLVED by the DuPage County Board that the attached Agreement between the County of DuPage and Christopher B. Burke Engineering, Ltd. be hereby accepted and approved for a contract total not to exceed $539,499.00 and that the Chair of the DuPage County Board is hereby authorized and directed to execute the Agreement on behalf of the COUNTY; and

BE IT FURTHER RESOLVED that an original copy of this Reso...

Click here for full text